LNG: First Stage of Zhangzhou LNG Terminal to Go Online in 2024

Feb-06 10:53By: Lawrence Toye

PipeChina will put the Zhangzhou LNG terminal, located in Zhangzhou city in Fujian province, into use in H1 2024, according to OilChem.

  • The first phase covers three, 160 mcm storage tanks allowing the facility to hold 3m mtpa of LNG.
  • The supporting transportation pipeline is planned to be put into operation simultaneously with the Zhangzhou LNG terminal.
  • Currently, CNOOC’s Fujian LNG terminal is the only terminal in the province, receiving 6.3m mtpa. The terminal imported 3.4m mt in 2023, an annual rise of 22.43%.
  • Fujian will also look to push for the Hanas Putian LNG terminal and PetroChina Fujian terminal projects amid an effort for the province to hit a regasification capacity of 15m mtpa by 2025.

Source: OilChem